Receive Updates
enter name:

enter email:

Home

Project List

About

In The News

Do You Have a Need?

Prayers

Partnerships

Volunteers

Donate

Photos

Resources

Contact Us

Project Details

Contact Project CrossWalk or your church's PCW
Representative for additional information about this project.

Project Name
10-03-06 Potts N
Project Description

Senior man in north Pottsboro, very self-sufficient but not physically able to handle these repairs, needs section of bedroom flooring replaced. He’s 88, and back and breathing problems, and lost his wife about 12 years ago. Currently lives alone with no family in the area. His neighbor submitted his name for consideration. Limited income, so no funds for materials.

About a 6’ x 8’ section of the floor in the bedroom, near the outside wall, has dropped about 4”. Feels spongy. Two pieces of furniture will need to be moved back, the carpet peeled back, and the flooring exposed. Will likely need to cut out this section, add blocking and shims to level, replace any damaged floor joists, install new subflooring section and top flooring piece (use screws), and lay carpet back down. House foundation is solid and sturdy (on concrete pillars with good beams and subflooring). Trap door for access to under house, but clearance is too tight to get back to this area for inspection underneath.

He bought some new screen wire for his porch, but has not installed it. Thin wood strips would need to be carefully removed, the old wire removed, new screen installed, and the wood strips reinstalled. Would be best to paint the strips before installing.

He did not ask for any painting to be done, but a spot in the bedroom ceiling and the guest bedroom closet door need to be painted with Kilz. Also, if a church wanted to scrape and paint the outside of the house (tan color), that’s a lower priority job that could also be done. It does need a new coat of paint.

This gentleman is wonderful company, and would bless the hearts of any group that wants to adopt the project.

Project Location
Pottsboro
Priority
Low-Med
Main Skills Needed
Basic carpentry
Special Tools Needed
Power recip and circular saws
Approximate # of
Volunteers Needed
6
# Hours Estimated
to Complete Project
8
Comments
 
(Please note that 2.2% of your donation and a 30 cent transaction fee will be deducted from your donation to pay PayPal fees. You can avoid these fees by mailing a check.)
Click Image for Larger Size